Saturday 7 January 2012

Final Design

The design has now been finalized for the crane, and drawn in CAD. Dimensions were adjusted in response to CAD optimization and stress analysis calculations, as well as real life considerations such as making material dimensions that are easy to source.

It is shown below:

Final Assembly

Lifting Block Carrier

Top Beam

End Upright

Quadpod

Feet

Beam to column joint in detail. (Will be welded to box section upright)

Assembly Pins

Top Beam Pins

No comments:

Post a Comment